Monster Factory

Chapter 209: Xiaoping Lake 2



Giving up Xiaoping Lake means giving up all hope.

Xiaoping Lake has been reported as a residence plan. If the location is temporarily changed, the person in charge of the team will inevitably ask for the reasons.

Originally, Zhongyun did not have much confidence in whether it can pass the review of urban health and civilization construction.

If this is the case, even if it thought with its toes, it knows that it would be squinting at the inspection team.

"Can't give up!" Vice Mayor Wu Shunyun stood up and took off his mask and showed his firm expression again.

"I can't keep my eyes open and watch all the organs and business people in Zhongyun City and worked hard for three months. In the end, I had no hope, and I would even be severely criticized."

"We have sewage in front of us. It is 1/4 of polluted Xiaoping Lake, not the sky in front of us."

"From now on, we want people to give people equipment. Whether it is membrane filtration, biodegradation, chemical degradation. We fight, even if it is not well managed, at least we have worked hard."

Even spelling, we should find the most reasonable spelling.

Two old professors from the chemical industry helplessly began to work on a plan that was doomed to failure.

At first, is deodorization, the smell of the water surface of Xiaoping Lake is really unbearable.

Two old professors plan to carry out large-scale deodorization by setting up ultraviolet radiation lamps.

There is a lot of ammonia and hydrogen sulfide in the water, which are easy to produce odor.

The two professors have developed inhibitors that are sprinkled into a large number of natural plants to decompose and absorb.

There are also membrane filtration technologies.

The ceramic membrane can indeed filter the sewage. Even if it can't solve all the sewage, it can at least filter out the harmful chemical components in the water.

At noon that day, people from sewage treatment stations, ceramic film manufacturers and stage lighting design studios gathered here with a large number of types of equipment.

Around Xiaoping Lake, there were rows of the large-scale array of lights like in an array of open-air concerts.

The incandescent lamp was replaced with an ultraviolet lamp. Several sewage treatment station workers wearing anti-UV suits were rowing boats and spraying the inhibitors into the water with a nebulizer.

The ceramic membrane filter device was also sent over, this small filter device with a multi-stage filter tube, as soon as it was put into operation, it played a very good effect.

Original blue-brown sewage, When it is pumped into the filtration station by the water pump, it becomes a clear brown like tea when it comes out along the water outlet.

The color changed, and the pungent smell before it was gone.

However, the good weather did not last long, the ceramic membrane filtration station just worked less than two minutes, the water flow at the outlet slowly suffocated, and the pump also followed the whistling noise.

When the workers opened the filter station casing, the entire row of ceramic membrane filters was completely blue.

The ceramic membrane filter is made of milky white, and it has a number of pores with a diameter of several tens of nanometers.

It can physically block many impurities that can be found in the water, in the filter tube.

The higher the impurities in the water, the faster the obstruction will naturally.

The workers took out the filter tube, and the filter tube not only turned into color but also filled with a thick layer of chemical waste, which made people feel sick.

There is a high-pressure flushing car next to it, and the filter tube is washed back under high pressure.

After the pollutants are washed away, the ceramic membrane filter tube can continue to be used.

However, dozens of mobile filtering stations in the field, after less than two minutes of operation, had to be dismantled and cleaned with a high-pressure water gun.

After cleaning, the working time became shorter.

"Renew the filter tube!" Deputy Mayor Wu Shunyun ordered.

On the side of Longxitan Beach, Ye Qing is still in the assembly shop.

The pollution of Xiaoping Lake, Ye Qing did not know for the time being.

The technology equipment of the water resort was completely loaded when it was last time, and many of the friends' circle uploaded.

Ye Qing did not go to see, now the circle of friends is full of advertisements, Ye Qing, who is busy, how can he go to see those advertisements?

In a few days, the Mechanical Colossus Type I is officially on the line, and Ye Qing plans to sell 60 Mechanical Colossus Type I to sell on the same day.

On the line ceremony, Ye Qing is also preparing to do something grand.

The location is set in the exhibition hall of the industrial park, where it is often rented by companies in the park, and some new product launches are held.

At that time, put sixty Mechanical Colossus Type I on big safflower, tied with red silk and satin and put them in two rows with open teeth and claws. Do not be too shocked.

This thing Ye Qing let the employees in the company be responsible for this, Ye Qing only works with ease to engage in production.

In the evening, on the side of the transfer warehouse, he has parked a new type of Mechanical Colossus Type I.

In Longxitan Beach factory, he continues to carry out large-scale production with bright lights.

On the construction sites where the road network has been poured, six giants are working hard and are driving the Mechanical Colossus Type X and I building plants.

When these factories are well built, Ye Qing can start researching the remaining black technology drawings.

A team with searchlights and hand-held detection equipment slowly touched the road around the sea.

They are the enforcement team of the Environmental Protection Bureau. Their task is to find the end of the pollution pipeline of Jinmei Chemical Company.

According to the employees of Jinmei Chemical, their boss Tang Jian has stolen the chemical sewage for many years. And the sewage pipe is likely to be hidden in the sea.

During the day, the EPA has already carried out sampling tests on the other side of the sea.

However, it has not been found that there is large chemical pollution in seawater.

Including sampling all nearby water sources, the same is true.

Even the groundwater was sampled, and the EPA was puzzled. Jinmei Chemical has flowed chemical wastewater for several years, and they are unable to find out the source of this pollution.

So they adopted one of the most stupid and most effective methods. Along the sewage pipeline, use the instrument to detect where the end of the pipeline is?

From six o'clock in the morning, they detected it until nine o'clock in the evening.

Now that the exploration work is finally coming to an end.

Zhongyun City, there are many talented people who come out! A member of the law enforcement team, looking at the road around the sea in front of him, said angrily,

"the truth must be said that the road around the sea has been built for more than ten years, and Jinmei Company has been able to spend the pipeline under the road towards the sea."

"There is definitely a non-excavation pipe rig, secret construction at night, the front is the sea. When we locate the pipeline, we will sail tomorrow morning to test the water quality."

"Where is it here? Black Bronze can't see the sign."

“It should be Longxitan Beach.” The famous staff opened the electronic map location on the mobile phone:

“No, the other team in Longxitan Beach has sampled it and heard that the water quality is very good.”

"Ghosts know how they sampled. Since Longxitan Beach has been secretly polluted for so many years, the water quality is absolutely polluted."

"I think the sampling team must have driven the boat far away and sampled in the open sea to produce this result."

Several exhausted staff members crossed the Huanhai Avenue indignantly, are ready to check with the testing team early tomorrow morning.

They used a flashlight to locate the pipeline as well as the mine.

When they stepped on the rugged gravel and positioned themselves on the edge of the beach, when the front is a few meters away, they finally breathed a sigh of relief.

"First go back, let the inspection team come over tomorrow, and thoroughly test the seawater again."

The carrying rods that were carried around were inserted next to them, and several staff members hurried to the road, sitting on the side of the road, waiting for the cars in the bureau to pick up them.

---------------------------------------------------------

Ps: if you liked this series and want to finish it as soon as possible, your support encourages me to broadcast more chapters per month

If you find any errors ( Ads popup, ads redirect, broken links, non-standard content, etc.. ), Please let us know < report chapter > so we can fix it as soon as possible.

Tip: You can use left, right, A and D keyboard keys to browse between chapters.